NETWORK OPERATIONS / FIBER ACCESS

Network topologyV15

From rollout data to a connected view.

Site List Main Data(2).xlsx · 1,141 sitesImports update this browser only. Download updated HTML to share your dataset.

Fiber connectivity

Completed FO · stages 6–8 Incomplete / dropped FO▣ ACC / Access Router● Unverified endpointClick a site or link for details · Scroll to zoom · Drag to pan
100%

Data coverage & review

Topology symbols

Small amber routers at the bottom left show the Capacity value (IOH B1 or IOH POC). Dotted gray connectors indicate this capacity association, not FO progress. Blank Capacity cells have no marker. Town Launch badges show the original P1, P2, P3, or P1P2Ext. value; blank remarks have no badge. Click a cross-ring CSG reference or ring heading to open that ring. Site names appear above the IDs. Site stack: Site ID Surge → Site ID → RAN → site readiness → CSG router → Seq. CSG “NY” / “CSG NY” is displayed as CSG NY Installed (not yet installed). NY RFI means not yet ready for installation; RFI means ready for installation. CSG: Cell Site Gateway. FO: Fiber Optic. ACC: Access Router, per your reference. Router color shows installation/integration progress, not live health.

Reading this topology

Rings are arranged by sequence. Connections follow the Excel Segment field, with each ring in its own lane. Links to other rings end at a labeled CSG reference showing the destination site and ring; repeated CSG symbols represent the same site, not additional sites. Station endpoints represent ACC / Access Routers.

Source & interpretation

Site List Main Data(2).xlsx · 1,141 site records. Multi-endpoint segments are split into consecutive links; each inherits the row’s FO progress and owner. Line labels show FO vendors: CCSI = China Comservice Indonesia, INTISEL = Intisel Prodaktifakom, PJU = Phainan Jaya Utama, BAISELINDO = Baiselindo Asia Network. Click a link for the full vendor name. This is a planning snapshot, not live telemetry.

REFRESH DATA

Import Excel workbook

Choose an .xlsx file with the same column layout. The selected worksheet replaces the current dataset after validation.

Required columns and rules

Ring, Seq (or Sequence), RAN, Site ID, Site ID Surge, Site Name, Suggestion, Site Status, FO Progress, Segment, FO Owner (or FO Vendor), CSG Integration Status (or CSG Remark). Optional City is used for regional filters. Optional Capacity is displayed as a small IOH marker.

Use unique Site IDs and unique sequence numbers within each ring. Endpoints without a site record are shown as unverified; Station names are ACC roots; Closure names are accepted for candidate analysis (including the source spelling “Closue”). Separate endpoints with semicolons. Suggestion must be Continue or Freeze. Save identifiers as text to preserve leading zeros. Recalculate and save formulas in Excel before importing.

Select a workbook to validate its data.

Up to 20 MB / 5,000 sites. Data stays in your browser; this does not publish changes for other visitors.